So the 4 wires on the single disconnect is the service disconnect, which seems to be different than what a lot of other people have. I did stumble across a similar post with a very similar setup recently. It was suggested to pull the meter and connect the CTs. But I think I’d rather try to connect the CTs to the 4 wires coming in from the meter (if they’ll fit) or even better just connect CTs to the sub panel, A/C, range, etc. so I can get the whole picture. So if I’m understanding this correctly I’d need (4) 50A CTs for the solar, A/C, Range, Dryer, and (2) 100A CTs for the sub-panel? Or would I only need (1) 100A CT for the sub-panel and double it?